Plan Takeoff 6: Compare revisions, copy and lock takeoffs

Drawings change during a job. Overlay shows exactly what moved between revisions, and copying and locking takeoffs keeps the measured work consistent across pages.

How to

  1. 1

    Check every page

    Open Page overview to see every page as a thumbnail and spot pages that still need a scale.

  2. 2

    Overlay a new revision

    Lay the new revision over the current plan, line up two pairs of points, and every change stands out in a contrasting colour.

  3. 3

    Copy takeoffs between pages

    Paste takeoffs onto other pages, either as empty items ready to measure or with their measured shapes.

  4. 4

    Lock and review

    Lock completed takeoffs so they can't be edited by accident, then check every total in the Takeoff Summary.