Plan Takeoff 6: Compare revisions, copy and lock takeoffs
Drawings change during a job. Overlay shows exactly what moved between revisions, and copying and locking takeoffs keeps the measured work consistent across pages.
How to
- 1
Check every page
Open Page overview to see every page as a thumbnail and spot pages that still need a scale.
- 2
Overlay a new revision
Lay the new revision over the current plan, line up two pairs of points, and every change stands out in a contrasting colour.
- 3
Copy takeoffs between pages
Paste takeoffs onto other pages, either as empty items ready to measure or with their measured shapes.
- 4
Lock and review
Lock completed takeoffs so they can't be edited by accident, then check every total in the Takeoff Summary.